Surface Treatment: | Spray-Paint |
---|---|
Manufacturing Process: | Casting |
Material: | Alloy Steel |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Feed Tube for CV228 CV229 VSI Crusher Spare Parts Supplier
VSI parts Made by high wear-resisting material:high chrome cast-iron.
We manufacture an extensive range of wear and spare parts in China for the worlds most popular crushing brands.
Crusher type |
Model |
Spare parts |
VSI crusher |
B6150SE B7150SE B9100SE |
Feed tube/rotor tip/wear plate/ feed eye ring/ top wear plate/ distributor plate/ trial plate /cavity wear plate bolt/rotor assembly |
CV117 CV128 CV129 CV217 CV228 CV229 |
||
4CRJ3042 CRJ3255 CRJ3750 |
Chemical composition
NO. |
chemical composition % |
HRC |
||||||||
C |
Si |
Mn |
Cr |
Mo |
Na |
Cu |
P |
S |
||
KmTBCr4Mo |
2.5-3.5 |
0.5-1.0 |
0.5-1.0 |
3.5-4.5 |
0.3-0.5 |
- |
- |
≤0.15 |
≤0.10 |
≥55 |
KmTBCr9Ni5Si2 |
2.5-3.6 |
1.5-2.2 |
0.3-0.8 |
8.0-10 |
0-1.0 |
4.5-6.5 |
4.5-6.5 |
- |
- |
≥58 |
KmTBCr15Mo |
2.8-3.5 |
≤1.0 |
0.5-1.0 |
13-18 |
0.5-3.0 |
0-1.0 |
0-1.0 |
≤0.10 |
≤0.06 |
≥58 |
KmTBCr20Mo |
2.0-3.3 |
≤1.2 |
≤2.0 |
18-23 |
≤3.0 |
≤2.5 |
≤1.2 |
- |
- |
≥60 |
KmTBCr26 |
2.3-3.3 |
≤1.2 |
≤1.0 |
23-30 |
≤3.0 |
≤2.5 |
≤2.0 |
- |
- |
≥60 |
Production
Hyton Casting
1.With 20 years experience ,High wear resistance feature,long life time.
2.Production capability: 30000 tons Per year.
3.Certified by ISO system certification.
4. Large amount of stock for customer with competitive price.
5. OEM service available.
6.Factory price save you 20%~50% costs
Packing and Shipping
After goods packaged well , we need only 1 day ship good to shanghai port ,which means that most of the spare
parts you bought from Hyton ,it will get your port within 30 days all around the world if ship by sea.
Advantage:
1)Your inquiry related to our product & price will be rapidly.
2) Well trained & experienced staff are to answer all your inquiries in English of course.
3) Your business relationship with us will be confidential to any third party.
4) One stop purchase service: extensive rang of products for qualified offering.
5) We response to client's inquiry within 12 hours.
Order Guiding:
1. Inquiry with your Drawing or Part Number.
2. Confirm the availability of the drawings under your number
3. Confirm the price,quantity, lead time, artwork, payment term etc
4. Quotation based on requirements.
5. Performa Invoice sent
6. Down payment paid and send your bank receipt
7. Production Process
8. Delivery- TT balance payment before shipment. Balance payment against B/L Copy or L/C is accepted. Inform the tracking number of the files expressed.
9. Order finished (only when you receive the goods and are satisfied with them)
10. Feedback about Quality, Service, Market Feedback & Suggestion. And we can do better in our future cooperation.